Kitchen floor change in Orihuela
Gather samples of the new and existing pavement and draw where they will meet. The match can show a difference in texture or tone without trying to hide it. You must also know the finished dimension of both sides to study the transition, avoiding choosing a profile only for its appearance before measuring the layers and support that will form the final floor.
Tell us about your kitchen
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
What we check before laying the pavement
- Existing baseCondition of the support and adherence of the current pavement.
- WithdrawalRaised from the ground if the project requires it.
- LevellingPreparation of the surface for the new finish.
- HeightsCompatibility with doors, plinths and appliances.
- PlacementInstallation of the flooring chosen according to its conditions.
- JointsTrims on skirting boards, thresholds and furniture.
Kitchen floor replacement quote in Orihuela
Check doors and nearby furniture
The placement of cabinets needs to share heights with the pavement. The extraction of apparatus must remain viable with the new level. It also represents the turning of the door over the encounter to check if it needs another adaptation, without attributing to a material of low thickness a compatibility that still depends on preparing the base. See also: removal of appliances.
Compare the same surface boundary
The assessment must distinguish base, material, placement and transition finishes, pointing out stripes that remain untouched. This description allows us to recognize which part of the amount corresponds to the product and which part corresponds to its installation. With that basis you will be able to compare complete options, without interpreting a sample surface as confirmation that the finished step, plinth or doors will resolve in the same way with any chosen material.
Quote and scope of work at Orihuela
The joint between two materials is valued with their thicknesses and supports. We identify the new surface, preparation and transition piece if applicable, distinguishing these works from replacing the flooring in the adjacent room.






