Installation of kitchen furniture in Orihuela
A visible side needs material, thickness and way of finishing against the floor or worktop identified before manufacturing. The fact that it shares a tone with the front does not confirm the same finish nor resolve its fixation. It is advisable to draw the face from the kitchen entrances to know which edges will be exposed, without treating the panel as an addition that can be incorporated at the end without affecting the opening or nearby openings.
Tell us about your kitchen
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
Orderly assembly, from units to adjustment
- PartsReview of the furniture and assembly plan.
- StakingChecking dimensions and position of each unit.
- SupportsAssessment of walls and necessary fixings.
- InstallationAssembly and levelling of base, high and column furniture.
- OpeningsPlacement and adjustment of doors, drawers and hardware.
- AuctionsPlinths, panels and planned joints.
Kitchen furniture installation quote in Orihuela
Check thickness and adjacent movements
The choice of doors should share hardware and clearances with that finish. The worktop singing needs to know your support and flight. A thicker panel can move the line or reduce the turn of a front, so the check is done with real parts and shooters before closing measurements, not just looking at a representation of colours matching all the closed cabinets. See also: worktop edge.
Assess the same degree of completion
The proposal must recognize units, panels, fixings and adjustments, distinguishing preserved and new pieces. If there is a pending measure, it is identified which part of the assembly depends on it. This description allows a comparison of a finished and accessible assembly, without attributing all the visible finishes to the front supply or assuming that it includes a preparation of the support or a lateral adaptation that has not yet been reviewed as necessary to place the chosen components in the kitchen.
Quote and scope of work at Orihuela
A visible panel must be identified as a supply or adaptation part. We assess thickness, finish and fixation along with the rest of the assembly, checking its relationship with the wall and worktop to include the finishes that complete the side.





